Recording and extensive study of all the problems of the Acropolis monuments in collaboration with other scholarly foundations, such as the National Technical University of Athens, Centre for Nuclear Research “Demokritos”, the Institute for Geological and Metallurgical Research.
Transfer of the pedimental statues of Kekrops and his Daughter and Kallirrhoe from the West pediment of the Parthenon to the Acropolis Museum.
Temporary measures taken for protection of the monuments: roofing placed over the Porch of the Maidens and over the West Frieze of the Parthenon.
Dismantling 6 ancient metopes from the west side of the entablature of the Parthenon north peristasis for protection.
The Institute of Geodynamics of the National Observatory of Athens installs the first accelerometer on the Acropolis.
The project “Development of Geographical Information Systems for the Acropolis of Athens” begins, it includes the photogrammetric surveying and the three-dimensional scanning of the wall and the Acropolis hill.
The completion of backfilling the foundation walls of the Arrephorion for protection.
Recording and documenting the poros architectural members found on the Acropolis rock.
Research programme in collaboration with the National Technical University of Athens examining the static behaviour of the Parthenon cella walls and seeking solutions for their restoration.
Installing a network of seven accelerometers on the Acropolis in collaboration with the Institute of Geodynamics of the National Observatory of Athens.
Completing the restoration of the ceiling of the Propylaia west hall. Removing the scaffoldings and the bridge crane from the west hall.
Completing the restoration in the west part of the entablature of the Parthenon north side.
Completing the restoration of the ceiling in the east stoa of the Propylaia. Removing the scaffoldings and the bridge crane.
Completing the cleaning of the Erechtheion coffered ceiling with laser light.
Completing the project “Development of Geographical Information Systems for the Acropolis of Athens”.
Signing a the memorandum of trilateral collaboration between YSMA, the National Technical University of Athens (NTUA) and the Mie University of Japan for the installation of two accelerometers.
Expanding the accelerometer network of the Acropolis, supporting its operation and processing the collected measurements.
Completing the restoration work of blocks coming from the top of the bastion in the Athena Nike temple, and also the enhancement of the basement space in the same temple.
Beginning the work of restoring the south wing of the Propylaia.
Binding fragments of poros architectural members.
Beginning of the educational programme “Acropolis and Restoration”.
Beginning carving flutes in the column fillings of the Parthenon Pronaos.
Casting copies of the pedimental sculptures and metopes of the west side of the Parthenon.
Awarding ESMA with the Grand Prix of Europa Nostra in the category “Dedicated Service by individuals or organisations”, and the work of restoring the Propylaia with the prize of Europa Nostra in the category of “Conservation”.
Completion and posting on the Internet of the “Repository of educational content for the Acropolis”, in collaboration with the National Documentation Centre (EKT) of the National Hellenic Research Foundation.
Beginning repositioning architectural members on the two corners of the entablature of the Parthenon west side .
Beginning works on the west wing of the Parthenon.
Beginning restoration works on the south wall, between the 6th and 7th buttress.
Examining the fillings of the Acropolis rock after digging inspection openings in parallel with the wall.
Completing the restoration works on the NW column of the Propylaia central building.
Completing the conservation works on the Athena Nike temple.
Removing inscriptions from the archaeological site to the old Acropolis Museum.
The results of a research into finding the suitable filling and sealing mortar containing less cement.
Signing a memorandum of collaboration between YSMA and the National Documentation Centre (EKT) for the digital organisation and distribution of information on the Athens Acropolis restoration works.
Beginning the restoration work on the Parthenon west pediment.
Beginning restoration works in the area B17 of the north wall of the Acropolis.
Donating and transporting the Derrick crane from the Parthenon to the NTUA Technological Park at Lavrio. Moving the Potain crane from the west side of the Parthenon to inside the monument.
Investigating whether a new structural stone was compatible for restoring the Acropolis wall in collaboration with the Centre for Stone conservation.
Completing the restoration of the No 21432 archaic triglyph.
Restoration works on the Acropolis north wall, in the area of the disabled access elevator.
Preparation of studies for a total intervention in the Acropolis walls (Strategic Plan and geotechnical-static studies).
Completion of conservation works on the colonnade of the Propylaia north wing.
Participation in works aiming at enhancing the infrastructure of the archaeological site (lightning protection, inventorying electricity networks) in collaboration with other services of the Ministry of Culture and Sports (EFAPA, DAAM, and DEEMPK and others).
Dismantling the base of the Potain crane from the west side of the Parthenon.
Commencing consolidation and enhancing works on the retaining walls in the area of the Mycenaean stairway.
Consolidating part of the buttressed wall and rock background of the north wall, in the area of the disabled access elevator.
Participation in enhancement works of the infrastructure of the archaeological site (installing a new disabled access elevator, lighting the monuments, and designing new routes for physically disabled users), in collaboration with other Services of the Ministry of Culture and Sports (EFAPA, DAAM, and DEEMPK and others).
Commencing research programmes for the study of the mechanical behaviour of clamping elements and materials, in collaboration with the NTUA and the Technical University of Crete.
In an effort to rearrange the area a total number of 105 scattered architectural members were transferred to the Chalkotheke.
Digital activities to celebrate the 45 years of ESMA’s operation.
Completing the restoration works on the area B17 of the north wall.
Completing the restoration of the north wall orthostate of the Parthenon cella.
Commencing conservation works on the Agrippa pediment.
Commencing an experimental and theoretical examination of the mechanical behaviour of the clamping elements and materials used on the Acropolis restoration works.
Holding the 7th International Meeting for the restoration of the Acropolis monuments.
Producing educational printed material “A Greek temple… for kids!”.
Commencing the restoration works on the orthostate of the south wall of the Parthenon cella.
Completing the consolidation and enhancement works on the retaining walls of the old excavation section in the area of the Mycenaean stairway.
Completing the conservation works on the Agrippa pediment (A’ phase).
Commencing the restoration works on the building situated on Polygnotou 13 to convert it into the “Charalambos Bouras” Documentation Centre of the Acropolis works. The works are conducted by the Directorate of Protection and Restoration of Modern and Contemporary Monuments and the Directorate of Conservation of Ancient and Modern Monuments.